Precision continuous manufacturing. The platform that proves it.

Nonwovens are a high-precision continuous process where small variation produces large quality impacts. The customers who buy your products, in medical, hygiene, filtration, and industrial applications, have zero tolerance for inconsistency. Neither do we.

The nonwovens problem set

Small deviations. Large consequences.

Process sensitivity

Process sensitivity Small deviations in raw material input, temperature, or line speed propagate directly into product quality. By the time a defect is visible, it's already in the batch.

Raw material substitutions

Raw material substitutions Input changes that look financially viable can destabilize a process. Validating the impact before a change goes live is cheaper than discovering it after a scrapped run.

Zero-tolerance customers

Zero-tolerance customers Medical and hygiene grade failures are not reworkable. A defect is a loss. Prevention, not detection, is the only acceptable outcome.

Why this works in nonwovens

Same concepts, different variables

Golden-run centerlining, root cause analysis, and real-time prediction were hardened on paper machines, a web process with the same structure as yours: continuous formation, drying, winding, and grade changes. The concepts map directly. Only the variables change.

No industry template needed

Models are built from your line's own historical data: basis weight, thickness, tensile, whatever defines your product. Not from paper assumptions.

Grade logic carries over

The same grade-transition logic that manages 5 to 40+ paper grades handles your product changeovers automatically.

Your historian, unchanged

Connects to your existing historian or SCADA in about 30 minutes. No rip-and-replace, no new data pipeline.

01 / The golden run

Intelligent Centerlining™

Every line has a best version of itself. Centerlining compares live production against your best historical runs and gives operators quantified adjustments to hold the process there, which is exactly what a precision web process needs.

  • Specific setpoint amounts, not vague alerts
  • Separates controllable variables from uncontrollable ones

Explore Intelligent Centerlining →

Approved visual needed

02 / Multi-variable quality events

Root cause analysis

When a quality metric breaches its limit, the platform ranks the 10–15 most likely contributing variables by influence, across linear and non-linear relationships, so a multi-variable event gets a shortlist instead of a war room.

  • Ranked by deviation severity and relative importance
  • Redundant signals filtered out automatically

Explore Root Cause Analysis →

Approved visual needed

03 / Before the defect is in the batch

Real-time quality prediction

Predictions update every 30 seconds across the parameters that define your product, so the team sees a drift while there's still time to correct it, not when offline testing finds it after the roll is wound.

  • Trend-focused predictions that drive action
  • Recommendations every 15 minutes, only when needed

Explore Real-Time Prediction →

Approved visual needed

Proof from the platform

Measured on webs like yours

Nonwovens is an expansion vertical for us, so we quote cross-industry results, not invented ones. Here's what the same mechanics have measured on continuous web processes.

>20%
Quality variability reduction
Pulp & paper deployments
30s
Prediction cadence
Continuous, live
~30 min
Historian connection
Existing infrastructure
<2 wks
To full deployment
Once connectivity is set

Figures reflect actual ProcessMiner deployments in other continuous-manufacturing verticals. Results vary by facility, process, and data quality; past performance is not a guarantee of future results.

How implementation works

Start with proof. Scale on results.

Every new customer follows the same staged path: a free analysis of the data you already collect, then a 60-day pilot on live production. From there, you expand as the results earn it. You set the pace.

Pilot program

1
Start here

Free Analysis

Includes

  • Offline PM Studio dashboard from your historical data
  • Data healthcheck of what you capture today
  • Findings reviewed with your team
2
Live Pilot

60-Day Pilot

Includes

  • Live PM Studio dashboards on your process
  • Real-time monitoring of trends and drift
  • Prediction, root cause & centerlining

Enterprise license

3
Stage 1

Predict at scale

Everything in the pilot, plus

  • Full deployment across your operation
  • Annual assessment of value delivered
4
Stage 2

Guided action

Everything in Stage 1, plus

  • Prioritized recommendations operators can act on
  • PM AI Agent for plain-language answers
  • Value capture tracking
5
Stage 3

Autonomous optimization

Everything in Stage 2, plus

  • Closed-loop control writing setpoints back to your systems
  • Trial vs. production analysis validating every change

Most teams enter at the Free Analysis, but you can step in wherever fits. How far you take it depends on where your operation is today.

Start with a Free Analysis

Precision deserves proof

See how the golden run maps to your line.

Bring your quality metrics and six months of historian data. We'll show you what the models would see, then decide together whether a pilot makes sense.

Historian connected in ~30 minutes. Full deployment in under two weeks.

Get in touch

Have a question?

Whether it's our platform, your process, or a pilot you'd like to see in action, let us know.

This field is for validation purposes and should be left unchanged.