Pulp & paper
- ~$1M
- Cumulative savings. One paper machine, 12 months.
- 25%
- Less wet-strength chemistry. One paper machine, 12 months.
- >20%
- Less quality variability. Pulp & paper deployments.
Every figure on this page is measured against that plant’s own baseline and labelled with the industry it came from: pulp and paper, water and wastewater, or plastics.
By industry
Each result stays with the industry it was measured in, so you can judge it against a plant like yours.
Single-deployment and pilot results, each against that plant’s own baseline. Results vary; past performance is not a guarantee of future results.
The ledger
Each figure comes from one deployment or pilot, labelled with its industry and the process it was measured on. None is an average or a guarantee.
| Result | What was measured | Industry | Where and when |
|---|---|---|---|
| >20% | Less quality variability | Pulp & paper | Pulp & paper deployments |
| 23% | Less quality variation | Pulp & paper | One paper machine, 12 months |
| 63% | Better target adherence vs. operator baseline | Pulp & paper | One paper machine |
| 25% | Less wet-strength chemistry | Pulp & paper | One paper machine, 12 months (10% is the conservative floor) |
| ~$1M | Cumulative savings | Pulp & paper | One paper machine, 12 months |
| ~1,600 lbs | Chemistry saved in one week | Pulp & paper | One paper machine, with closed-loop control on 32% of the time |
| ~20 | Machines in closed-loop control | Pulp & paper | One paper and packaging organization, after about 2 years |
| 13% → over 20% | Sludge cake solids, no added polymer | Water & wastewater | Wastewater dewatering pilot |
| ~2× | Dewatering capacity, same operating hours | Water & wastewater | Wastewater dewatering pilot |
| 28% → 77% | Clarifier blanket time in its target band | Water & wastewater | Water reclamation pilot, open-loop recommendations |
| 25% | Scrap-rate reduction | Plastics | Injection molding, single-machine pilot |
Figures marked “industry benchmark” or “industry range” elsewhere on this site, such as $20K–$200K for an hour of unplanned downtime, are not ProcessMiner results.
Our measurement standard
Agreed with your team in advance, from how your operators already run the process.
Every figure names its industry and process. One machine is never stretched into a fleet claim.
Tracked continuously and reported month by month, so each figure is a running record.
Free Process Data Assessment
Start with a free Process Data Assessment. We’ll take a closer look and let you know exactly what your own data can do.
Needs 6–12 months of process history with timestamped lab results.
Questions, answered
Get in touch
Whether it's our platform, your process, or a free Process Data Assessment you'd like to start, let us know.
Rather talk? Call +1 (470) 910-0770.