Aeration runs blind
Aeration runs blind Blowers typically run continuously without feedback control. Driving them from actual oxygen demand is the highest near-term ROI lever in most plants.
Aeration blowers consume more than 50% of a wastewater plant's energy budget, and most run at a continuous, fixed rate regardless of actual oxygen demand. ProcessMiner has proven deployments in industrial wastewater, including a sludge dewatering application that improved cake dryness from 13% to 20%.
Industrial wastewater, specifically
We work with industrial wastewater sites: facilities attached to pulp & paper, food & beverage, and chemical operations, where treatment performance hits the parent plant's P&L directly.
Aeration runs blind Blowers typically run continuously without feedback control. Driving them from actual oxygen demand is the highest near-term ROI lever in most plants.
Polymer overdosing costs twice Excess polymer isn't just wasted spend. It flows back through the filtrate and disrupts the treatment process upstream, so precise dosing is a cost issue and a performance issue at once.
Regulation is tightening PFAS and microplastics rules are advancing, and biosolids land application is being restricted in Europe and Maine. Timestamped, defensible process data is becoming a legal asset, not just a record.
The platform predicts where treatment quality is heading and recommends (or automates) aeration and polymer setpoints to match actual demand, instead of running everything at a fixed safe maximum.
Approved visual needed
A wastewater deployment typically scopes around 200 process tags, a fraction of a paper machine's footprint. When performance deviates, the platform ranks the contributing variables so the team adjusts the right lever first.
Approved visual needed
For critical-infrastructure and regulated facilities, the full platform runs on a single CPU-based server inside your network. Nothing leaves your firewall, and every reading is timestamped and auditable.
Approved visual needed
Measured results
Cake dryness figure from an industrial wastewater ProcessMiner deployment. Results vary by facility, process, and data quality; past performance is not a guarantee of future results.
How implementation works
Every new customer follows the same staged path: a free analysis of the data you already collect, then a 60-day pilot on live production. From there, you expand as the results earn it. You set the pace.
Pilot program
Includes
Includes
Enterprise license
Everything in the pilot, plus
Everything in Stage 1, plus
Everything in Stage 2, plus
Most teams enter at the Free Analysis, but you can step in wherever fits. How far you take it depends on where your operation is today.
Start with a Free AnalysisPilot-ready
For qualified industrial pilot deployments, we can supply the sensors and the server. We'll validate against your plant's own baseline and you keep the results either way.
Already seen the platform in action? If you're ready to start a pilot, click below.
Request a PilotSensors and server hardware available for qualified pilots. On-premises deployment for regulated sites.
Get in touch
Whether it's our platform, your process, or a pilot you'd like to see in action, let us know.